  References

 Wastewater Collection and Treatment Systems

  • PROJECT
    1-5
  • PROJECT
    6-10
  • PROJECT
    11-15
  • PROJECT
    16-20
  • PROJECT
    21
> PROJECT 1 <
Detailed Design and Construction Supervision of Wastewater Collection
and Wastewater Treatment Systems for Rattanakosin Area
 Project Duration
 Construction : 28 Sept.1990 to 27 Sept.1991
 Operation : 30 Sept.1993 to 3 May 2001
 Client : Bangkok Metropolitan Administration
 Construction Cost : 862.00 Million Baht
> PROJECT 2 <
Preliminary Study, Data Acquisition, Initial Data Processing
and Construction Supervision for the Design and Construction of Bangkok Wastewater Project - Stage 1
 Project Duration
 Design : 23 Aug.1991 to 20 Dec.1991
 Construction : 1 Nov.1993 to 1996
 Client : Bangkok Metropolitan Administration
 Construction Cost : 6,382.76 Million Baht
> PROJECT 3 <
Preparation of Tender Documents for Turnkey Construction of Sewerage
and Wastewater Treatment Plant for Phuket Municipality
 Project Duration : 18 Sept.1992 to 17 Feb.1993  Client : Public Works Department
 Construction Cost : 722.0 Million Baht
> PROJECT 4 <
Evaluation of Tender Documents for Turnkey Construction of Sewerage
and Wastewater Treatment Plant for Phuket Municipality
 Project Duration : 7 Sept.1993 to 6 Dec.1993  Client : Public Works Department
 Construction Cost : 384.0 Million Baht
> PROJECT 5 <
Feasibility  Study on Drainage and Wastewater Treatment Systems for
Sakon Nakhon Municipality
 Project Duration : 29 Jan.1993 to 2 Oct.1993  Client : Public Works Department
 Construction Cost : 1,132.3 Million Baht
> PROJECT 6 <
Feasibility Study, Detailed Design and Construction Supervision of Drainage
and Wastewater Treatment Systems for Songkhla Municipality
 Project Duration
 Design : 1 Oct.1993 to 25 Sept.1994
 Construction : 1 Nov.1995 to Aug.2001
 Client : Public Works Department
 Construction Cost : 299.70 Million Baht
> PROJECT 7 <
Detailed Design and Construction Supervision of Drainage
and Wastewater Treatment Systems for Chon Buri Municipality
 Project Duration
 Design : 1 Oct.1993 to 27 Jul.1994
 Construction : 2 Mar.1998 to 15 Jan.2001
 Client : Public Works Department
 Construction Cost : 565.0 Million Baht
> PROJECT 8 <
Feasibility Study and Preliminary Design on Wastewater Collection
and Treatment Systems for Maehongson Municipality
 Project Duration : 24 Aug.1994 to 15 Mar.1995  Client : Maehongson Province
 Construction Cost : 65.2 Million Baht
> PROJECT 9 <
Detailed Design of Drainage and Wastewater Treatment Systems
for Sakon Nakhon Municipality
 Project Duration : 14 Sept.1994 to 10 July 1995  Client : Public Works Department
 Construction Cost : 410.0 Million Baht
> PROJECT 10 <
Detailed Design of Drainage and Wastewater Treatment Systems for
Nonthaburi Municipality (Rattanathibate Area)
 Project Duration : 30 Sept.1995 to 24 Sept.1996  Client : Public Works Department
 Construction Cost : 3,200.0 Million Baht
> PROJECT 11 <
Detailed Design  of Wastewater Collection and Treatment Systems for
Phuket Pollution Control Area, Patong Municipality
 Project Duration : 29 Aug.1997 to 29 May 1998  Client : Phuket Province
 Construction Cost : 650.0 Million Baht
> PROJECT 12 <
Feasibility Study and Preliminary Design on Wastewater Collection
and Treatment Systems for Buayai Municipality
 Project Duration : 3 Sept.1997 to 13 Nov.1998  Client : Buayai Municipality
 Construction Cost : 196.12 Million Baht
> PROJECT 13 <
Detailed Design of Wastewater Collection and Treatment Systems for
Phuket Pollution Control Area, Karon Municipality
 Project Duration : 2 Jul.1999 to 24 Apr.2000  Client : Phuket Province
 Construction Cost : 393.9 Million Baht
> PROJECT 14 <
Feasibility Study of Khlong Toey Wastewater Treatment Project
 Project Duration : 10 Feb.2000 to 9 Dec.2001  Client : BMA (PTC perform as Thai Consultants of Camp Dresser &                McKee International Inc.)
 Construction Cost : 9,294 Million Baht
> PROJECT 15 <
Detailed Design of Wastewater Collection and Treatment Systems for
Nakhon Sithamarat Municipality
 Project Duration : 17 Aug.2000 to 29 May 2001  Client : Nakhon Sithamarat Municipality
 Construction Cost : 1,507.9 Million Baht
> PROJECT 16 <
The Assessment of the Appropriate Alternatives for the Samut Prakarn
Wastewater Collection and Treatment Systems Project
 Project Duration : 9 Mar.2004 to 21 Sep.2005  Client : Pollution Control Department
 Construction Cost : 23,000 Million Baht
> PROJECT 17 <
The Design of the Wastewater Treatment Plant Second Stream of the Suvarnabhumi Airport
 Project Duration : 17 Jun.2004 to 15 Aug.2004  Client : New Bangkok International Airport Co., Ltd.
 Construction Cost : 297.9 Million Baht
> PROJECT 18 <
Bang Sue Environmental Education and Conservation Project, Bangkok
 Project Duration : 21 Dec.2005 to 8 Apr. 2008  Client : Bangkok Metropolitan Administration
 Construction Cost : 4,584.78 Million Baht
> PROJECT 19 <
Feasibility Study of Improvement and Expansion of Pattaya
Wastewater Collection and Treatment Systems
 Project Duration : 14 Dec. 2006 to 7 Sept.2007  Client : Pattaya City
 Construction Cost : 947.99 Million Baht
> PROJECT 20 <
The Design of Improvement and Expansion of Wastewater Collection
and Treatment Systems at Soi  Wat Bun Kanchanaram, Pattaya
 Project Duration : 2 May 2007 to 27 Dec.2007  Client : Pattaya City
 Construction Cost : 939.27 Million Baht
> PROJECT 21 <
Minburi Wastewater Treatment Project (Feasibility Study and Detailed Design)
 Project Duration : 19 Jan.2012 to 13 July 2012  Client : Bangkok Metropolitan Administration
 Construction Cost : 446.90 Million Baht
 
 
 
 
 Water Supply System and Water resources

  • PROJECT
    1-5
  • PROJECT
    6-10
  • PROJECT
    11-15
  • PROJECT
    16-20
  • PROJECT
    21-25
  • PROJECT
    26-30
  • PROJECT
    31-35
  • PROJECT
    36-40
  • PROJECT
    41-42
> PROJECT 1 <
Detailed Design and Construction Supervision of Water Supply System
for Thai Petrochemical Industry Public Co.,Ltd.
 Project Duration : 29 Jan.1993 to 2 Oct.1993  Client : Thai Petrochemical Industry Public Co.,Ltd.
 Construction Cost : 200.0 Million Baht
> PROJECT 2 <
Detailed Design on Water Supply System for
Siam Cement Factory at Kao Wong I
 Project Duration : 10 Aug.1992 to 8 Sept.1992  Client : Siam Cement Public Campany Limited
 Construction Cost : 73.14 Million Baht
> PROJECT 3 <
Detailed Design of Water Treatment System for
Siam Eastern Industrial Park
 Project Duration : Sept.1993 to Feb.1994  Client : Siam Eastern Industrial Co., Ltd.
 Construction Cost : 45.0 Million Baht
> PROJECT 4 <
Feasibility Study and Detailed Design for Construction
and Improvement of Rural Waterworks (Project Area II) Fiscal Year 1995
 Project Duration : 9 June 1995 to 9 Jan.1996  Client : Provincial Waterworks Authority
 Construction Cost : 462.9 Million Baht (15 areas)
> PROJECT 5 <
Feasibility Study and Detailed Design for Ratchaburi
and Samut Songkhram Waterworks Linking Projects
Project Duration : 12 Apr.1996 to 12 Feb.1997  Client : Provincial Waterworks Authority
  Construction Cost : 992.92 Million Baht
> PROJECT 6 <
Feasibility Study and Detailed Design for Srisaket Waterworks
Improvement and Expansion Project
 Project Duration : 12 Apr.1996 to 12 Feb.1997  Client : Provincial Waterworks Authority
 Construction Cost : 446.88 Million Baht
> PROJECT 7 <
Detailed Design of Water Treatment System for
Thai Petrochemical Industry Public Company Limited
 Project Duration : 10 May 1996 to 10 Jan.1997  Client : Thai Petrochemical Industry Public Company Limited
 Construction Cost : 180.0 Million Baht
> PROJECT 8 <
Feasibility Study and Detailed Design for Sanitary District Water System
Development and Improvement (Group I)
 Project Duration : 30 May 1996 to 13 Jan.1997  Client : Public Works Department
 Construction Cost : 709.5 Million Baht
> PROJECT 9 <
Survey and Detailed Design for Nakhon Ratchasima Municipality
Water System Improvement Project
 Project Duration : 16 Sept.1996 to 8 May 1998  Client : Public Works Department
 Construction Cost : 3,265.0 Million Baht
> PROJECT 10 <
Survey, Detailed Design and Preparation of Tender Documents for
the Construction of Water System Improvement /Expansion for PWA's
Waterworks in Project Area I, Fiscal Year 1996
 Project Duration : 9 Oct.1996 to 6 May 1997  Client : Provincial Waterworks Authority
 Construction Cost : 841.7 Million Baht
> PROJECT 11 <
Survey, Detailed Design and Preparation of Tender Documents for
the Construction/Improvement of Rural Waterworks (Project Area II) Fiscal Year 1996
 Project Duration : 9 Oct.1996 to 6 May 1997  Client : Provincial Waterworks Authority
 Construction Cost : 317.0 Million Baht (14 areas)
> PROJECT 12 <
Survey and Detailed Design of Municipality Water Supply System
Improvement and Expansion Project (Group II)
 Project Duration : 31 July 1997 to  22 Oct.1998  Client : Public Works Department
 Construction Cost : 640.32 Million Baht
> PROJECT 13 <
Survey, Detailed Design and Preparation of Tender Documents for
Contruction of Water System Improvement /Expansion for
PWA's Waterworks in Project Area II, Fiscal Year 1997
 Project Duration : 24 Sept.1997 to 15 Dec.1998  Client : Provincial Waterworks Authority
 Construction Cost : 417.0 Million Baht
> PROJECT 14 <
Detailed Design of Water Distribution System Rehabilitation
for Thammasat University, Rungsit Campus
 Project Duration : 4 Aug.1998 to 11 Nov.1998  Client : Thammasat University
 Construction Cost : 15.0 Million Baht
> PROJECT 15 <
Feasibility Study and Detailed Design of Pumping Scheme
for Water Supply and Agricultural Uses, Nakhon Ratchasima
 Project Duration : 23 Aug.1999 to 6 Sept.2000  Client : Royal Irrigation Department
 Construction Cost : 655.0 Million Baht
> PROJECT 16 <
Survey, Detailed Design and Preparation of Tender Documents for
Contruction of Water System Improvement /Expansion for Surin
Waterworks in Project Area I
 Project Duration : 1 June 2000 to 26 Sept.2000  Client : Provincial Waterworks Authority
 Construction Cost : 316.0 Million Baht
> PROJECT 17 <
Dambreak Study of Klong Tha Dan Dam, Amphoe Muang
Nakhon Nayok Province Project
 Project Duration : 10 July 2000 to 8 Mar.2001  Client : Royal Irrigation Department
 Construction Cost : 5.99 Million Baht
> PROJECT 18 <
Survey, Detailed Design and preparation of Tender Documents for
Construction of Water System Improvement / Expansion for
Nongkhai Waterworks (Project Area I)
 Project Duration : 2 Aug.2001 to 19 Dec.2001  Client : Provincial Waterworks Authority
 Construction Cost : 201.13 Million Baht
> PROJECT 19 <
Feasibility Study and Detailed Design of Pumping Scheme
for Natural Resource Replenishment, Nakhon Ratchasima
 Project Duration : 8 June 2001 to 29 Nov. 2002  Client : Royal Irrigation Department
 Construction Cost : 455.5 Million Baht
> PROJECT 20 <
Project of the Environmental Impact Assessment and Analysis after
the Construction of the Bang Pakong Barrage and the Environmental Deterioration Assessment
 Project Duration : 1 Feb.2001 to 30 Aug.2002  Client : Office of the Natural Rescurces and Environmental Policy                and Planning
 Construction Cost : 22.29 Million Baht
> PROJECT 21 <
Action Plan to Rectify the Hydraulic Impact and River Bank Erosion Problems
Caused by Bang Pakong Dam
 Project Duration : 22 Oct.2001 to 8 Sept.2003  Client : Royal Irrigation Department
 Construction Cost : 465.86 Million Baht
> PROJECT 22 <
Feasibility Study and Detailed Design of the Improvement of
Mae Faek - Mae Ngad Irrigatio Project
 Project Duration : 25 Mar.2002 to 15 Sep.2003  Client : Royal Irrigation Department
 Construction Cost : 136.02 Million Baht
> PROJECT 23 <
The Formulation of Integrated Plan for Water Resources Management in
the Bang Pakong - Prachinburi River Basin
 Project Duration : 22 Aug.2002 to 16 Mar.2004  Client : Water Resources Department
 Construction Cost : 11.987 Million Baht
> PROJECT 24 <
Feasibility Study on the Improvement of Phetchaburi Operation and Maintenance Project
 Project Duration : 1 Aug. 2003  to  30 Mar. 2005  Client : Royal Irrigation Department
 Construction Cost : 972.99 Million Baht
> PROJECT 25 <
The Formulation of Integrated Plan for Water Resources Management in Mun River Basins
 Project Duration : 19 Mar.2004 to 15 Jun.2006  Client : Water Resources Department
 Construction Cost : 25.389 Million Baht
> PROJECT 26 <
Detailed Design of Water Treatment Plant with capacity of not less than
12,000 cu.m./day (Beer Thip Brewery (1991) Co., Ltd.)
 Project Duration : 1 Sep 2004 – 5 Aug 2005  Client : Beer Thip Brewery (1991) Co.,Ltd.
 Construction Cost : 123.50 Million Baht
> PROJECT 27 <
Study on Installation of Telemetering System for Flood Forecasting
and Warning Purpose for the Bang Pakong River Basin
 Project Duration : 1 Dec.2004 to 20 Nov.2006  Client : Royal Irrigation Department
 Construction Cost : 55.38 Million Baht
> PROJECT 28 <
Integrated Water-Resources Management Plan for Petchaburi
and the West Coast (Prachuab Khiri Khan) Basins
 Project Duration : 8 Jul.2005 to 21 Aug.2006  Client : Water Resources Department
 Construction Cost : 8.90 Million Baht
> PROJECT 29 <
Detailed Design of Water Treatment Plant with capacity of not less than 300 cu.m./hr.                            Cosmos Brewery  (Thailand) Co.,Ltd.
 Project Duration : 14 Nov 2005 – 31 Mar. 2006  Client : Cosmos Brewery (Thailand) Co.,Ltd
 Construction Cost : 158.32 Million Baht
> PROJECT 30 <
Improvement of Detailed Design Drawing and Cost Estimation of
Water Supply System for Nakhon Ratchasima Municipality
 Project Duration : 7 Dec.2005 to 4 Feb.2006  Client : Nakhon Ratchasima Municipality
 Construction Cost : 3,679.58 Million Baht
> PROJECT 31 <
Improvement of Khok Kathiam Operation and Maintenance Irrigation Project
 Project Duration : 11 Jan.2006 to 3 July 2007  Client : Royal Irrigation Department
 Construction Cost : 361.61 Million Baht
> PROJECT 32 <
The Improvement and Water Management with Public Participation of
The Phra Ong Chaiyanuchit Operation and Maintenance Project, Chachoengsao
 Project Duration : 27 Feb.2006 to 21 May 2007  Client : Office of Regional Irrigation 11, Royal Irrigation Department
 Construction Cost : 743.65 Million Baht
> PROJECT 33 <
Pathum Thani Water Supply Project Enhanced Supply Works
 Project Duration : 12 Oct.2006 to 30 June 2008  Client : CH.Karnchang Public Co.,Ltd.
 Construction Cost : 693.0 Million Baht
> PROJECT 34 <
Feasibility Study and Detailed Design of Water Supply Expansion for Ratburi Municipality
 Project Duration : 16 Oct. 2006 to 11 June 2007  Client : Ratburi Municipality
 Construction Cost :1 st phase   145.33  Million Baht
                                    2nd phase    65.81   Million Baht
> PROJECT 35 <
Detailed Design of Water Treatment Plant for Bangpa-in Industrial Estate
 Project Duration : 22 Mar.2007 to 22 Oct.2007  Client : Bangpa-in Land Development Co.Ltd.
 Construction Cost : 304.55 Million Baht
> PROJECT 36 <
Integrated Water Resource Management Project : Bangpakong River Basin (Study and Construction of Hydrological - Meteorological - Water Quality Telemetry and Early Warning System)
 Project Duration : 7 June 2007 to 27 Nov.2008  Client : Water Resources Department
 Construction Cost : 67.88 Million Baht
> PROJECT 37 <
Study, Survey and Installation of Flood Forecasting and Warning Telemetry
System and Regional Data Center  for Middle and Lower Chi River Basin Project
 Project Duration : 11 June 2008 to 10 Apr.2009  Client : Water Resources Department
 Construction Cost : 52.59 Million Baht
> PROJECT 38 <
Dambreak Study of Kio Kho Ma Dam,Lampang Province Project
 Project Duration : 30 Mar.2009 to 16 Sept. 2010  Client : Royal Irrigation Department
 Construction Cost : 24.42 Million Baht
> PROJECT 39 <
 1. Banglen Water Treatment Plant, Expansion Phase 1
 2. Detailed design of structural and civil works for water treatment system expansion
    of Banglen Water Treatment Plant, Phase 1
 Project Duration : 1) 23 Dec.2008 to 29 Oct.2010
                                 2) 12 Feb.2009 - 28 Dec. 2009
 Client : 1) S.Napa (Thailand) Co.,Ltd.
               2) CH.Karnchang Public Co.,Ltd.
 Construction Cost : 1,000.0 Million Baht
> PROJECT 40 <
Master Plan and Feasibility Study for Water System Improvement/Expansion
of Provincial Waterworks in Chonburi
 Project Duration : 6 May 2009 to 17 Sept. 2010  Client : Provincial Waterworks Authority
 Construction Cost : 14,094.4 Million Baht
> PROJECT 41 <
Study, Survey and Installation of Flood Forecasting and Warning
Telemetry System for Chao Phraya and Middle Mun river basins
 Project Duration : 29 May 2009 to 21 May 2010  Client : Water Resources Department
 Construction Cost : 104.94 Million Baht
> PROJECT 42 <
Study, Survey and Installation of Flood Forecasting and Warning
Telemetry System for Mekong Basin and Songkhla Lake Basin
 Project Duration : 9 Feb.2010 to 2 Feb.2011  Client : Water Resources Department
 Construction Cost : 87.95 Million Baht
 
 
 
 Flood Protection and Drainage Systems

  • PROJECT
    1-5
  • PROJECT
    6-10
> PROJECT 1 <
Detailed Design of Flood Protection System for Nakhon Sawan Region
 Project Duration : 23 Sept.1996 to 18July 1997  Client : Public Works Department
 Construction Cost : 1,704.0 Million Baht
> PROJECT 2 <
Detailed Design of Drainage System Rehabilitation
Silphakorn University, Wang Tha Phra Campus
 Project Duration : 29 Oct.1998 to 3 Nov.1998  Client : Silphakorn University
 Construction Cost : 5.9 Million Baht
> PROJECT 3 <
Feasibility Study for Nakhon Sithamarat Flood Alleviation Project
 Project Duration : 27 Oct.2000 to 25 Jan. 2002  Client : Royal Irrigation Department
 Construction Cost : 1,974.5 Million Baht
> PROJECT 4 <
The Detailed Design of Flood Protection Systems for Urban Area in Phrae
 Project Duration : 20 June 2001 to 9 Feb.2003  Client : Public Works Department
 Construction Cost : Phrae : 1,307.68  Million Baht
                                    Denchai : 248.33   Million Baht
> PROJECT 5 <
Chantaburi Flood Alleviation Project
 Project Duration : 9 April 2002 to 2 July 2003  Client : Royal Irrigation Department
 Construction Cost : Emergency Plan : 145.43  Million Baht
                                     Long Plan  :  536.85   Million Baht
> PROJECT 6 <
Master Plan, Feasibility Study and Detailed Design of Flood Protection System
for Urban Area in Nakhon Si Thammarat
 Project Duration : 17 May 2005 to 6 Nov.2006  Client : Department of Public Works and Town & Country Planning
 Construction Cost : 8,200.0 Million Baht (MP : 19 Municipalities)
                                     1,163.8 Million Baht (FS :   5 Municipalities)
> PROJECT 7 <
Master Plan, Feasibility Study and Detailed Design of Flood Protection System
for Urban Area in Nakhonsawan
 Project Duration : 25 Apr.2006 to 12 Nov.2007  Client : Department of Public Works and Town & Country Planning
 Construction Cost : 5,094.98 Million Baht (MP : 18 Municipalities)
                                     3,655.33 Million Baht (FS : 8 Municipalities)
> PROJECT 8 <
Master Plan Study, Feasibility Study and Detailed Design of Flood Protection Systems
for Communities in Phayao Province
 Project Duration : 9 Aug.2007 to 28 Nov.2008  Client : Department of Public Works and Town & Country Planning
 Construction Cost : 2,737.70 Million Baht (MP : 13 Municipalities)
                                     1,806.10 Million Baht (FS : 4 Municipalities)
> PROJECT 9 <
Master Plan Study, Feasibility Study and Detailed Design of Flood Protection Systems
for Communities in Mae Hong Son Province
 Project Duration : 17 Apr.2008 to 7 Oct.2009  Client : Department of Public Works and Town & Country Planning
 Construction Cost : 1,224.62 MB. (MP : 7 areas)
                                     1,249.80 MB (FS : 5 areas)
> PROJECT 10 <
Master Plan Study, Feasibility Study and Detailed Design of Flood Protection Systems
for Communities in Buriram Province
 Project Duration : 20 July 2010 to 10 Nov.2011  Client : Department of Public Works and Town & Country Planning
 Construction Cost : 1,593.20 Million Baht (MP : 16 areas)
                                     1,069.84 Million Baht (FS :  4 areas)
 Infrastructure System

  • PROJECT
    1-5
  • PROJECT
    6-10
  • PROJECT
    11-14
> PROJECT 1 <
Detailed Design of Wastewater Collection and Treatment Systems
of Laem Chabang Industrial Estate
 Project Duration : Apr. 1988 to Nov. 1988  Client : Industrial Estate Authority of Thailand
 Construction Cost : 220.1 Million Baht
> PROJECT 2 <
Detailed Design and Construction Supervision of Wastewater Treatment Plant
for Chonburi Industrial Estate (Bo Win)
 Project Duration
 Design : June 1990 to Mar. 1991
 Construction : Sept. 1990 to May 1992
 Client : Eastern Industrial Co.,Ltd.
 Construction Cost : 96.0 Million Baht
> PROJECT 3 <
Detailed Design and Construction Supervision of Central Utility System
for Kabinburi Industrial Zone
 Project Duration
 Design : May 1990 to Jan. 1991
 Construction : Mar. 1991 to Jan. 1995
 Client : Kabinburi Industrial Zone Co.,Ltd
 Construction Cost : 450.0 Million Baht
> PROJECT 4 <
Detailed Design and Construction Supervision of Wastewater Collection
and Treatment Systems for Eastern Industrial Estate (Mab Ta Phut)
 Project Duration
 Design : July 1990 to May 1991
 Construction : Oct. 1992 to Dec. 1994
 Client : ACT Consultants Co.,Ltd, Eastern Industrial Estate
 Construction Cost : 170.0 Million Baht
> PROJECT 5 <
Detailed Design of Infrastructure for Jong Sathit Industrial Park
 Project Duration : Aug. 1990 to May 1991  Client : Tandem Architects Co.,Ltd.
 Construction Cost : 200.0 Million Baht
> PROJECT 6 <
Detailed Design of Infrastructure for Thanyathanee Country Club
 Project Duration : Jan. 1991 to Aug. 1991  Client : Biofile Land and House Co.,Ltd.
 Construction Cost : 300.0 Million Baht
> PROJECT 7 <
Detailed Design and Construction Supervision of Infrastructure
for Carlberg Brewery (Thailand) Co., Ltd.
 Project Duration
 Design : Apr. 1993 to Sept. 1993
 Construction : Nov. 1992 to Jan. 1994
 Client : Preecha Nanakhit Co, Ltd.
 Construction Cost : 50.0 Million Baht
> PROJECT 8 <
The Design and Preparation of Tender Documents for The Central Utilities
for the Second Bangkok International Airport
 Project Duration : 20 Apr.1995 to 6 Aug.1997  Client : New Bangkok International Airport Co.,Ltd.
 Construction Cost : 1,100.0 Million Baht
> PROJECT 9 <
Detailed Design of Wastewater Treatment and Water Reuse Systems for Elephant Building
 Project Duration : Oct. 1995 to Jan. 1996  Client : Thamthani Co.,Ltd.
 Construction Cost : 0.8 Million Baht
> PROJECT 10 <
The Design and Preparation of Tender Documents for The Utilities Distribution Systems
(Water Distribution and Wastewater Collection) for the Second Bangkok International Airport
 Project Duration : 8 Dec.1995 to 27 Oct.1999  Client : New Bangkok International Airport Co.,Ltd.
 Construction Cost : 734.0 Million Baht
> PROJECT 11 <
Detailed Design of Central Utility System for Rayong Larp Industrial Park
 Project Duration : 26 Apr.1996 to 26 Oct.1996  Client : Rayong Larp Co.,Ltd.
 Construction Cost : 6100.0 Million Baht
> PROJECT 12 <
Detailed Design on Infrastructure of 13th Asian Games at Thammasat University
 Project Duration : 30 May 1996 to 23 Sept.1996  Client : Ministry of Finance
 Construction Cost : 521.625 Million Baht
> PROJECT 13 <
Detailed Design of Central Utility System for Sing Buri Pattana Industrial Park
 Project Duration : 18 Sept.1996 to 18 Feb.1997  Client : Sing Buri Pattana Industrial Park Co.,Ltd.
 Construction Cost : 220.0 Million Baht
> PROJECT 14 <
Consultancy Services for Modifications to the Design of the Water Distribution & Wastewater Collection Systems of the Suvarnabhumi Airport
 Project Duration : 24 Jun.2003 to 19 Dec.2003  Client : New Bangkok International Airport Co.,Ltd.
 Construction Cost : 767 Million Baht
 
 Construction Supervision Service

  • PROJECT
    1-5
  • PROJECT
    6-7
> PROJECT 1 <
Supervision of Turnkey Construction of Sewerage and Wastewater Treatment Plant for Phuket Municipality
 Project Duration : 10 Aug.1994 to 26 Mar. 1997  Client : Public Works Department
 Construction Cost : 390.0 Million Baht
> PROJECT 2 <
Construction Supervision of Pattanee Municipality Drainage
Wastewater Collection and Treatment Systems Project
 Project Duration : 1 Nov.1995 to Aug.2001  Client : Public Works Department
 Construction Cost : 348.0 Million Baht
> PROJECT 3 <
Construction Supervision of Nakhon Ratchasima Municipality Drainage
Wastewater Collection and Treatment Systems Improvement Project
 Project Duration : 15 Jan.1998 to 18 Mar.2002  Client : Nakhon Ratchasima Municipality
 Construction Cost : 580.0 Million Baht
> PROJECT 4 <
Construction Management and Construction Supervision of the Turnkey Construction
of Bangkok Wastewater Project Stage 1 (Remaining Works Part 4)
 Project Duration :
 Construction : 1 Sept.2003 to 30 Sept.2004
 Operation : 1 Oct.2004  to 30 Sept.2005
 Client : Bangkok Metropolitan Administration
 Construction Cost : 419.9 Million Baht
> PROJECT 5 <
Construction Supervision Consultant Services for Main Transformer Station No. 2
and Wastewater Treatment Plant Second Stream for the Second Bangkok International Airport Project
 Project Duration : 13 Jun. 2005 to 12 Oct. 2006  Client : The Airports of Thailand Public Company Limited
 Construction Cost : 203.70 Million Baht
> PROJECT 6 <
Construction Supervision of Wastewater Collection and Treatment Systems
for Nakhon Ratchasima Municipality (Phase 2) Project
 Project Duration : 29 Nov.2005 to 9 Aug.2008  Client : Nakhon Ratchasima Municipality
 Construction Cost : 738.66 Million Baht
> PROJECT 7 <

Consulting services for Construction Administration and Supervision of The Bang Sue Environmental
Education and Conservation Project, Bangkok
Contract No.1: Construction of Bang Sue
Environmental Education and Conservation Center and Wastewater Treatment Facilities

 Project Duration : 27 Dec.2008 to 30 Sept.2013  Client : Bangkok Metropolitan Administration
 Construction Cost : 2,546.0 Million Baht
 
 
 
 Wastewater Treatment System

  • PROJECT
    1-2
> PROJECT 1 <
A Feasibility Study of BMA Wastewater User Charge
 Project Duration : 29 July 1997 to 22 May 1998  Client : Bangkok Metropolitan Administration
 Construction Cost : 13.0 Million Baht
> PROJECT 2 <
Feasibility Study on User Charge and Institution for Local Authorities with Wastewater Treatment
and Solid Waste Disposal Systems
 Project Duration : 27 July 1998 to 29 Oct.1999  Client : Office of  Environmental Policy and Planning,  Ministry of                Science, Technology and Environment
 Construction Cost : 6.0 Million Baht
 
 
 
 Building

  • PROJECT
    1-3
> PROJECT 1 <
The Detailed Design of the Office of the Administrative Courts Building
 Project Duration : 5 Sept. 2003 to 3 Mar. 2005  Client : The Office of the Administrative Courts
 Construction Cost : 1,814.0 Million Baht
> PROJECT 2 <
Detaild Design of the Multi-Purpose Building, Assumption School
 Project Duration : July 2004 to Dec. 2005  Client : Assumption School
 Construction Cost : 253.45 Million Baht
> PROJECT 3 <
Detailed Design of the Ministry of Social Development
and Human Security Building
 Project Duration : 30 Aug.2004 to 25 Mar.2005  Client : Ministry of Social Development and Human Security
 Construction Cost : 800.0 Million Baht
 
 

 

 

 
Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.