                  | Project Area 38.5 sq.km.
 
  |  
                  | Activated  Sludge Process Wastewater Treatment Plant,Cacpcity 13,000 cu.m./.day
 
 
  
 |  
 | 
                
                  | Project  Location | : Nonthaburi Municipality,  Nonthaburi |  
                  | Client | : Public Works Department |  
                  | Project  Duration | : 30 Sept.1995 to 24 Sept.1996 |  
                  | Construction  Cost | : 3,200.0 Million  Baht |  
                  | Service  Fee | : 33.25 Million  Baht |  
                  | Associated Firm | : CMPS&F Co.,Ltd. |  
                  |  |  
                  | Project  Description |  
                  | Nonthaburi locates in Bangkok Metropolitan Region, on  Chao Phraya river's side. Nonthaburi municipality, now grows rapidly, so  resulting in the increase in water pollution problem.
 This project area is about 38.5 km2 with population of 640,700 and wastewater  quantity about 260,000 cu.m./d. For wastewater characteristic, BOD  concentration is about 120 mg./l., COD concentration is about 200 mg./l., TKN  of 30 mg./l., SS of 120 mg./l. and TP of 8 mg.as P/l.
 
 The services provided included :
 
                      Preparing of tender documents, contract documents,  construction plan and operation and maintenance manualReview feasibility study report
 
Detailed design of wastewater collection system and  canal improvement for 10 existing canals
 
Detailed design of 8 drainage pump stations
 
Detailed design of wastewater lift stations and CSOs.
 
Detailed design of activate sludge wastewater  treatment plant, capacity of 130,000 cu.m./d. and combined with biological  nitrogen and phosphorus system |  |