Bangkok, in present time, is the center of aviation in this world's region, so the number of passengers using the Bangkok International Airport (Don Muang) are dramatically increasing and make the existing airport too crowded. Thai government,then, make a decision to construct the new airport at Nong Ngu Hao. The construction is divided into 3 phases to handle 30, 60 and 100 million passengers per year.
Scope of work for this project succeeds from the design of temporary facilities for the airport, that PTC has been designed.
The services provided include :
- Detailed design of water distribution system
- Detailed design of wastewater collection system
- Detailed design of water supply station and 40,000 cu.m. storage tank
- Cost estimation and tender document preparation
|