Progress Technology Consultants Co.,Ltd. Project 1-8
Feasibility Study and Preliminary Design on Wastewater Collection
and Treatment Systems for Maehongson Municipality

Project Area 7.4 sq.km.

Activated Sludge,Capacity 4,650 cu.m./da



Project  Location : Maehongson Municipality
Client : Maehongson Province
Project Duration : 24 Aug.1994 to 15 Mar.1995
Construction Cost : 65.2 Million Baht
Service Fee : 3.90 Million Baht
 
Project Description

Preparation of the master plan, feasibility study and  preliminary design for the drainage, wastewater collection and treatment systems. The study area covers the existing municipal area, approximately 7.4 sq.km.

The services provided include :

Master Plan and Feasibility Study

  • Survey  the project area and the existing combined drainage system.

  • Study the socio-economic, Landuse and population in project area.

  • Wastewater sources, characteristics and flowrate identification.

  • Determine the population in the project area for the year 2014.

  • Preliminary design for the improvement of  existing drainage system.

  • Preliminary design for the improvement of the wastewater collection system and other related work.

  • Determine the amount of BOD loadings for wastewater treatment plant design.

  • Preliminary design for the wastewater treament system.

  • Estimate the capital cost of the project and the annual cost of operation and maintenance.

  • Study the economic and financial evalulation.

  • Study the organization and administration.

  • Study the intial environmental examintion.

Preliminary Detailed Design

The work covered the preliminary designs of drainage, wastewater collection, wastewater treatment systems and other related work, including cost estimation and construction schedule preparation.

The detailed of the completed systems are as follows :

  • Detailed design of drainage system, consists of pipes range from 600 to 1,200 mm. with total length of 2.25 km. and U-ditch range from 300-900 mm. at the length of 1.7 km.

  • Detailed design of wastewater collection system, consists of pipes range from 100 mm. to 400 mm.

  • Detailed design of activated sludge process wastewater treatment plant with a capacity of 4,650 cu.m./day.

Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :


12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.