Progress Technology Consultants Co.,Ltd. Project 1-6
Feasibility Study, Detailed Design and Construction Supervision of Drainage
and Wastewater Treatment Systems for Songkhla Municipality

Oxidation Pond, Aerated Lagoon and Polishing Pond

Aerated Lagoo



Project  Location : Songkhla Municipality, Songkhla
Client : Public Works Department
Project Duration  
Design : 1 Oct.1993 to 25 Sept.1994
Construction : 1 Nov.1995 to Aug.2001
Project Cost : 1,934.9 Million Baht
Construction Cost : 299.70 Million Baht
Service Fee  
Design : 17.50 Million Baht
Construction : 11.24 Million Baht
 
Project Description

The Town of Songkhla is regarded as the center of development in the southern region with sophisticated fishing pier, several marine product industries and a deep seaport contributing to its rapid growth. Contrary to the  infrastructure, development has been lagged behind. This results in the town being confronted with environmental problems, particularly the pollution of Songkhla Lake, Khlong Kwang, Khlong Samrong and the beach along the southern part of the town. The problem stems from wastewater from households and industries being discharged directly to the waterways has apparently  deteriorated, causing adversely effect to the health of the public as well as the beautiful scenery of the lake and beach.

The Public Works Department, having realized the above mentioned problem, has formulated improvement plan whereby Feasibility Study and Detailed Design are to be undertaken for the  Drainage and Wastewater Treatment System for the Municipality of Songkhla to help improve the environmental condition, public health as well as foster socio-economic development in the study area.

This project area is about 33 km2. Estimated population is 130,000 in 2013 AD. Average wastewater flowrate is 35,630 cu.m./d. with BOD5 of 170 mg./l.,  COD of 420 mg./l. and  SS of  95 mg./l.

The services provided include :

  • Flood protection and drainage system.

  • Wastewater collection system  and  waste-water  transportation system to wastewater treatment plant, 8 km from project area.

  • Aerated lagoon wastewater treatment plant, capacity 36,000 cu.m./d. on the area of 176 rais (28 ha.)

  • Implementation plan and cost estimation for full phase of construction, costs about 1,935 million baht.

  • Study the economic and financial evaluation including development of tariff structures.

  • Study the organization and administration

  • Undertake the initial environmental examination

Progress Technology Consultants Co.,Ltd. is also responsible for the construction supervision for this project.  The construction has been completed since 2001.


Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.