Progress Technology Consultants Co, Ltd. took responsibility in design and construction supervision for factory of Carlberg Brewery (Thailand) Co, Ltd.
The services provided include :
- Detailed Design of Infrastructure.These system are as follows :
- Water treatment system with a capacity of 100 and 400 cu.m./hr.
- Raw water transmission system
- Water distribution system
- Flood protection and storm drainage systems
- Fire protection system
- Construction Supervision. The scope of work includes :
- Supervision, inspection and consulting for water supply system in both construction and installation categories. The water resource are surface water and ground water at the capacity of 100 and 400 cu.m./hr, respectively.
- Supervision, inspection and consulting for construction of sewer drain system, flood protection system and fire protection system.
|