Progress Technology Consultants Co.,Ltd. Project 1-13
Detailed Design of Wastewater Collection and Treatment Systems
for Phuket Pollution Control Area, Karon Municipality

Activated  sludge wastewater treatment plant,
Capacity 6,000 cu.m./day in 1st phase
and10,000 cu.m/.day in 2nd  phase




Project  Location : Karon Municipality, Phuket Province
Client : Phuket Province
Project Duration : 2 Jul.1999 to 24 Apr.2000
Construction Cost : 393.9 Million Baht
Service Fee : 12.584 Million Baht
 
Project Description

To relief water pollution problem in Phuket, especially at the famous beaches, Phuket was announced to the pollution control area and then Karon wastewater project was implemented by coordination between Pollution Control Department and Phuket province. The Project area is about 7.28 sq.km.

Target year for this project is 2022 AD. Estimated population is about 25,230. Average wastewater quantity to plant is 8,594 cu.m./day with BOD5 of 100 mg./l., SS of 100 mg./l., TKN of 30 mg./l., and P of 8 mg.as P/l.

The services provided include :

  • Study the number of populations and the wastewater quantity and quality.

  • Review the reports and study the appropriated alternatives of the drainage, wastewater collection and treatment systems.

  • Detailed design of the drainage, wastewater collection and treatment systems.

  • Prepare the cost estimation, the budget of the project and the tender documents.

  • Determine the managerial and administrative organization of the wastewater drainage, collection and treatment systems.

  • Determine the tariff rate of the wastewater collection and treatment systems from various user classes in order to collect the  appropriated user charge.

  • Undertake the initial impact of the environmental examination.

  • Study on recycled method of the wastewater treated for the other activities.

  • Provide technical advice during the project construction and operation stages.

  • Study the expansion of continuing project

The detailed of the completed systems are as following :

  • Detailed design of drainage system, consists of pipes range from 600 to 1,500 mm. with total length of  8.8 km., and U-ditch  range from 600 - 1,500 mm. at the length of 10.5 km. and canals improvement

  • Detailed design of wastewater collection system, consists of pipes range from 400 mm. to 800 mm. with total length of  7.5 km.

  • Detailed design of pump stations, CSO’s and  lift station

  • Detailed design of bio-filter activated sludge wastewater treatment plant  with a capacity of  6,000 cu.m./d  in 1st phase and 10,000  cu.m./d  in 2nd phase

Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.