Progress Technology Consultants Co.,Ltd. Project 2-2
Detailed Design on Water Supply System for
Siam Cement Factory at Kao Wong I

Project Layout

Water Treatment Plant, capacity 325 cu.m./hr.



Project  Location : Tambon Kaowong, Amphoe Phraphudtabaht, Saraburi
Client : Siam Cement Public Campany Limited
Project Duration : 10 Aug.1992 to 8 Sept.1992
Construction Cost : 73.14 Million Baht
 
Project Description

Detailed design of water supply and pumping systems for Siam Cement Factory at Kao Wong I was described as follows :

  • Detailed design of the water supply system for reducing sludge in a raw water source in Klong Rerng Rang. The potential of water transmission is 325 cu.m./hr.

  • Design of the storage pond at the water pumping station for pumping into the storage pond at Ban Teen None. The potential of water transmission is 250 cu.m./hr. in a current and 325 cu.m./hr. in the future.

  • Design of a concrete storage tank with metal at Ban Teen None, with a capacity of 2,000 cu.m./hr. for storage water from the water pumping station at Klong Rerng Rang and from the groundwater pond at Ban Teen None.

  • Design of water pumping station at Ban Teen None for transmitting to the storage pond with a capacity of 1,000 cu.m. at Kao Wong Factory and also transmitting to the storage pond at a stone mine, with a capacity of 50,000 cu.m. The potential of water transmission is 250 cu.m./hr. in a current and 325 cu.m./hr. in the future.

  • Design of storage pump at water pumping station of Siam Cement Factory for
    pumping into the storage pond, with capacity 1,000 cu.m. The potential of water transmission is 250 cu.m./hr. in a current and 325 cu.m./hr. in the future.

  • Design of the water pipe from the existing water pipe for transmitting to the storage pond, with 50,000 cu.m.

  • Design of all water pumping control system for the sufficient water consumption.

  • Analyse on the phenomenon of Water Hammer (hydraulic shock) of water pipe line between of Klong Rerng Rang and Ban Teen None and between of Ban Teen None and Siam Cement Factory at Kao Wong I. Besides, it was also designed of damaged protection system in water pumping system.

Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :


12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.