Progress Technology Consultants Co.,Ltd
Language
Progress Technology Consultants Co.,Ltd. Project 2-27
Study on Installation of Telemetering System for Flood Forecasting
and Warning Purpose for the Bang Pakong River Basin




Project  Location : The project area spreads from the Bang Pakong river mouth to   the upstream area covering Nakhorn Nayok, Mainstream Prachin   Buri, Khlong Tha Lat and Khlong Luang sub-river basins.
Client : Royal Irrigation Department
Project Duration : 1 Dec.2004 to 20 Nov.2006
Construction Cost : 55.38 Million Baht
Service Fee : 55.38 Million Baht
 
Project Description

The purpose of the project is to establish information system to support flood mitigation planning and warning activities, as well as providing accurate and consistent tools for decision support system in order to enhance the efficiency of water resource management in the project area.

The project’s scope of work included :

1. Created implementation plans and developed a network of hydrological and     meteorological telemetering stations which provide real-time data to be primarily
    used for flood forecasting, early warning system, water quality monitoring, and flood     management system that will improve efficiency of water resource management
    in the Bang Pakong river basin.

2. Developed a new and improved the link and integration system of the existing     network that can be seamlessly integrated with the expanded system. The existing     networks include the following remote telemetering stations located in the Bang
    Pakong river basin:

    • Horthong Station, Amphoe Ban Sang, Prachin Buri province.
    • Somboon Station, Amphoe Ongkharak, Nakorn Nayok province.
    • Phanthong Station, Amphoe Bang Pakong, Chachoengsao province.
    • Ban Pho Station, Amphoe Ban Pho, Chachoengsao province.
    • Saphan Chachoengsao Station, Amphoe Ban Pho, Chachoengsao province.
    • Bang Pakong Diversion Dam, Amphoe Mueang Chachoengsao, Chachoengsao province.

          The data acquired from both existing and expanded networks is not only
          integrated but also applied to flood forecasting model also developed
          under the project.

3. Improved and enhanced the capabilities of the existing flood forecasting system     based on state-of-the-art mathematical modeling and developed a reliable and     consistent early warning system for automatic real-time flood forecasting and
    warning applications.

4. Developed a decision support system (DSS) used for flood management in the Bang     Pakong river basin.

5. Established data base system that is compatible and applicable to other systems or     activities (e.g. public information and warning system)

 


Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.