Project Area 2,400 rais (384 ha.)
 |
Aerated Lagoon, capacity 20,000 cu.m./day

|
|
Project Location |
: Amphoe Kabinburi, Prachinburi |
Client |
: Kabinburi Industrial Zone Co.,Ltd. |
Project Duration |
|
Design |
: May 1990 to Jan. 1991 |
Construction |
: Mar. 1991 to Jan. 1995 |
Construction Cost |
: 450.0 Million Baht |
|
Project Description |
Kabinburi Industrial Zone locates on km. 12 of Kabinburi-Korat road, Prachinburi. This project area is approximately 2,400 rais (384 ha.).
The services provided include :
- Surface water treatment plant, at capacity of 21,000 cu.m./d., consists of raw water pumping station, floculation tank, sedimentation tank, sand filter, clear well and sludge lagoon
- Wastewater collection system consists of GRP pipe, 43 km. long, and 7 lift stations
- Drainage system consists of RC pipe, 20 km. long, and RC ditch, 26 kg. long
- Aerated lagoon wastewater treatment plant, capacity of 20,000 cu.m./d. at BOD concentration of 500 mg/l.
- Flood protection system consists of dike and drainage ditch connected to public canal
This project has been already finished since January 1995. Construction time is about 47 months.
Progress Technology Consultants Co.,Ltd. took responsibility in design and construction supervision. |
|