Progress Technology Consultants Co.,Ltd. Project 1-16
The Assessment of the Appropriate Alternatives for the Samut Prakarn
Wastewater Collection and Treatment Systems Project

Wastewater Treatment Plant, capacity 525,000 cu.m./day



Project  Location : Approximately 127 km2 with the service area in Samut Prakan   Province.
Client : Pollution Control Department
Project Duration : 9 Mar.2004 to 21 Sep.2005
Construction Cost : 23,000 Million Baht
Service Fee : 42.76 Million Baht
Service Fee (PTC) : 23.52 Million Baht
Associated Firm : Black & Veatch Thai Infrastructure Ltd. And  Black & Veatch   (Thailand) Ltd.
 
Project Description

The implementation of the Assessment of Appropriate Alternatives for Samut Prakan Wastewater Collection System and WWTP Turnkey Project was planned and structured to cover all issues of interest and concern raised by related stakeholders in every sector, with the aim to clarify these issues and use the information gathered to support the decision making for the policy to reduce wastewater problems in Samut Prakan Pollution Control Zone and in the Gulf of Thailand. The details are as follows:

The services provided include :

1. Review & Analysis of Relevant Data

In order to ensure that the study covered all unclear matters and issues of concern in technical, engineering, environmental, and economical aspects, the study, analysis and assessment on the technical and environmental impact.

2. Inspection and Evaluation of the Construction Contract

The process commenced with data gathering, reviews, analyses, field surveys and inspection of the collection system and WWTP including the development of mathematical models for simulating the operation of the collection system and the WWTP.

3. Development of Alternatives, Establishment of Criteria and Ranking of Alternatives

The development of alternatives, establishment of criteria and ranking of alternatives for the Samut Prakan Pollution Control Zone Wastewater Collection System & Treatment Plant Turnkey Project considered all project issues and problems which were of concern as identified by stakeholders in every sector, and then analyzed them for improved clarification and to develop alternatives and criteria

4. Technical Hearing and Stakeholders Participation

This study was structured to receive the comments from experts/specialists in various fields as well as stakeholders from groups residing within the project area. The results from the hearings were integrated with the study results to provide a more complete study.


Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :


12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.