Project Area 1,200 rais (192 ha.)
 |
Wastewater Treatment Plant, capacity 8,500 cu.m./day

|
|
Project Location |
: Amphoe Inburi, Sing Buri |
Client |
: Sing Buri Pattana Industrial Park Co.,Ltd. |
Project Duration |
: 18 Sept.1996 to 18 Feb.1997 |
Construction Cost |
: 220.0 Million Baht |
|
Project Description |
Sing Buri Pattana Industrial Park locates in Amphoe Inburi, Sing Buri. The project area is about 1,200 rais (192 ha.).
The services provided include :
- Detailed design of water treatment plant with a capacity of 9,000 cu.m./day
- Detailed design of water distribution and fire fighting systems
- Detailed design of drainage system
- Detailed design of wastewater collection system
- Detailed design of wastewater treatment plant with a capacity of 8,500 cu.m./day. The treatment system is designed as activated sludge.
- Prepare technical specification and tender documents
- Estimate the capital cost of the project
All utilities has been designed to facilitate phasing. The capacity or components of each systems are compatable to related systems. So they can be build as module system, connected to the existing unit to increase the capacity while still keeping the work efficiency, thus cost effectiveness can be achieved.
Progress Technology Consultants Co.,Ltd. took responsibility in detailed design of all facilities. |
|