Raw Water Intake
 |
Water Treatment Plant, capacity 100,000 cu.m./day

|
|
Project Location |
: 43 Moo.3 Chiangrak Noi-Bangsai Rd., Baan Pathum, Samkhok, Pathumthani |
Client |
: CH.Karnchang Public Co.,Ltd. |
Project Duration |
: 12 Oct.2006 to 30 June 2008 |
Construction Cost |
: 693.0 Million Baht |
Service Fee |
: 9.141 Million Baht |
|
Project Description |
Part No. 1 : Pathum Thani water supply extension project planning; phase 3 and 4, and detailed design of water treatment plant at capacity of 100,000 cu.m./day.
The work includes the following tasks:
- Process design Analysis for water treatment system, capacity 100,000 cu.m./day
- Detailed design of structural works, foundation works and architectural works for water treatment system.
- hydraulic analysis for water treatment system
- Detailed design of mechanical and piping works for water treatment system.
- Detailed design of electrical works for water treatment system.
- Detailed design of instrumentation and control system for water treatment system.
- Detailed design of site plan pipe works for water treatment system.
- Preparation of machine and equipment specification for water treatment system, consulting for machine and equipment procurement.
Part No.2 : Provide consulting during construction
Part No.3 : Provide consulting during start-up and commissioning |
|