Project Area
 |
Water Treatment Plant, capacity 2,000 cu.m./hr.

|
|
Project Location |
: Ratchaburi and Samut Songkhram |
Client |
: Provincial Waterworks Authority |
Project Duration |
: 12 Apr.1996 to 12 Feb.1997 |
Construction Cost |
: 992.92 Million Baht |
Service Fee |
: 18.81 Million Baht |
Service Fee (PTC) |
: 11.91 Million Baht |
Associaled Firm |
: Binnie & Partners (Overseas) Ltd. |
|
Project Description |
Feasibility study ,survey and detailed design for Ratchaburi and Samut Songkhram Waterworks linking project.The Project area covers Samut Songkhram Municipality and the communities along the finished water transmission pipe route from Ratchaburi to Samut Songkhram.
The services provided include :
Feasibility Study
- Survey, data collection and data analysis ; comprising physical,economical and development plan data.
- Determination of future population and water demand up to the year 2011 for the project area.
- Study of potential raw water sources.
- Study of water treatment system and distribution systems,with emphasis on leakage reduction, including connections to other waterworks in the vicinity.
- Comparisons and selection of the best alternatives.
- Preliminary designs and cost estimates.
- Recommendation for the water supply system development/improvement in phases.
- Economic and financial analysis to perform water tariff at break even cost in different source of fund.
Detailed Design
- Survey and detailed design for raw water ,water treatment plant with a capacity of 48,000 cu.m./ day, water transmission and distribution systems, including the instrumentation and control systems for the water supply system development/ improvement projects recommmended for Phase I.
- Detailed cost estimates and preparation of tender documents for each construction contract.
|
|