Project Area
 |
Wastewater Treatment Plant,
capacity increases from 20,000 m3/day to 63,000 m3/day.

|
|
Project Location |
: Soi Wat Bun Kan Chana Ram, Pattaya |
Client |
: Pattaya City |
Project Duration |
: 2 May 2007 to 27 Dec.2007 |
Construction Cost |
: 939.27 Million Baht |
Service Fee |
: 5.72 Million Baht |
|
Project Description |
Study and detailed-design for construction of improvement and expansion of Soi Wat Bun Kan Chana Ram, Pattaya wastewater collection and treatment system can be sufficiently treated the wastewater and decreased the problem of Pattaya’s water pollution.
The services provided include :
Feasibility Study
- Review the study and detailed-design of the Pattaya Pollution Control Zone Wastewater Collection and Treatment System Report undertaken by PCD.
- Collect the necessary data and physical survey for evaluated capacity of the drainage and collection system.
- Study the drainage, wastewater collection and treatment system, socio-economic problem, and health problem.
- Analysis meteorology, hydrology and hydraulic data.
- Survey data such as topography, soil investigation, land use, trend trespass lets off the drainage, existing wastewater collection and treatment system, pumping station and method for construction of improvement and expansion drainage and wastewater system.
- Analysis and offer the construction guideline of improvement and expansion drainage and WWTP system in study area.
- Preliminary Design of construction of improvement and expansion drainage and WWTP system for each alternatives and cost estimates.
- Compare financial, socio-economic, environmental and engineering alternatives.
- To offer the implementation plan and responsible party.
- To carry out the feasibility study report and relevant documents.
Detailed Design
- Review the project of Pattaya Pollution Control Zone of drainage and wastewater collection and treatment system which be constructed and had been operated.
- Detailed design for construction of improvement and expansion of Pattaya drainage collection and WWTP system.
- To determine the detailed-design standard under standard of department of city planning or in-house standard are which be accepted , in case of, have no standard in the country follow to other acceptable standard in the foreign country, which must appropriate the state of Thai and area state for the construction
- Detailed-design by consider to powerful engineering, powerful architecture, saving, suitable construction method and operation and maintenance.
- Cost estimates.
- To carry out the framework project by device the promise of construction to agree with budget administer and construction period.
- To carry out the bidding document under regulation and standard of government agencies.
|
|