Progress Technology Consultants Co.,Ltd. Project 1-20
The Design of Improvement and Expansion of Wastewater Collection
and Treatment Systems at Soi  Wat Bun Kanchanaram, Pattaya

Project Area

Wastewater Treatment Plant,
capacity increases from 20,000 m3/day to 63,000 m3/day.




Project  Location : Soi Wat Bun Kan Chana Ram, Pattaya
Client : Pattaya City
Project Duration : 2 May 2007 to 27 Dec.2007
Construction Cost : 939.27 Million Baht
Service Fee : 5.72 Million Baht
 
Project Description

Study and detailed-design for construction of improvement and expansion of Soi Wat Bun Kan Chana Ram, Pattaya wastewater collection and treatment system can be sufficiently treated the wastewater and decreased the problem of Pattaya’s water pollution.

The services provided include :

Feasibility Study

  1. Review the study and detailed-design of the Pattaya Pollution Control Zone Wastewater Collection and Treatment System Report undertaken by PCD.

  2. Collect  the necessary data and physical survey  for evaluated capacity of the drainage and collection system.

  3. Study the drainage, wastewater collection and treatment system, socio-economic problem, and health problem.

  4. Analysis meteorology, hydrology and hydraulic data.

  5. Survey data such as topography, soil investigation, land use, trend trespass lets off the drainage, existing wastewater collection and treatment system, pumping station and method for construction of improvement and expansion drainage and wastewater system.

  6. Analysis and offer the construction guideline of improvement and expansion drainage and WWTP system in study area.

  7. Preliminary Design of construction of improvement and expansion drainage and WWTP system for each alternatives and cost estimates.

  8. Compare financial, socio-economic, environmental and engineering alternatives.

  9. To offer the implementation plan and responsible party.

  10. To carry out the feasibility study report and relevant documents.
Detailed Design
  1. Review the project of Pattaya Pollution Control Zone of drainage and wastewater collection and treatment system which be constructed and had been operated.

  2. Detailed design for construction of improvement and expansion of Pattaya drainage collection and WWTP system.

  3. To determine the detailed-design standard under standard of department of city planning or in-house standard are which be accepted , in case of, have no standard in the country follow to other acceptable standard in the foreign country, which must appropriate the state of Thai and area state for the construction

  4. Detailed-design by consider to powerful engineering, powerful architecture, saving, suitable construction method and operation and maintenance.

  5. Cost estimates.

  6. To carry out the framework project by device the promise of construction to agree with budget administer and construction period.

  7. To carry out the bidding document under regulation and  standard of government agencies.

 


Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.