Progress Technology Consultants Co.,Ltd. Project 2-3
Detailed Design of Water Treatment System for
Siam Eastern Industrial Park

Project Area 1,300 rai

Water Treatment Plant, capacity 500 cu.m./hr.



Project  Location : Amphoe Puang dang, Rayong
Client : Siam Eastern Industrial Co., Ltd.
Project Duration : Sept.1993 to Feb.1994
Construction Cost : 45.0 Million Baht
 
Project Description

Siam Eastern Industrial Park locates in Amphoe Puangdang, Rayong. The project area is about 1,300 rais.

The services provided include :

  • Detailed design of water treatment plant. Treatment system consists of the following units :
Capacity : 500 cu.m./hr.
Raw Water Source : 1 m3 reservior
Raw Water Pumping : Submersible pump
Rapid Mixing Tank : Mechanical mixers
Slow Mixing Tank : Round the end hydraulic flooculator  & Taper velocity   gradient G valve from 70 sec-1 to 20 sec-1
Sedimentation Tank : Round the end hydraulic flocculator & Taper velocity   gradient G valve from 70 sec-1 to 20 sec-1
Filtration Tank : Continuous sand filter
Sludge Treatment : Sludge lagoon
Chemical Feeding System : Alum, Lime, Polymer, Chlorinedioxide
Distribution : End suction centrifugal pump
Pumping Station : centrifugal pump
Instrument and Control System : Manual Control

 


Image Gallery Scoce of Services Contact Us
       For each of the field of activities, the PTC provides
a complete range of consulting services as summarized below

Reconnaissance Survey.
Field Investigations.
Study and Planning.
Engineering and Design.
Supervision, Engineering Advice and Construction Management.
Training and Guidance.
address :


Tel :

FAX :
E-mail :
Website :

12/14-15 Pathumwan Place condominium,
Soi Kasaemsan 1 Rama 1 Rd. Patumwan,
Bangkok 10330.
0-2214-3810,0-2215-2748,0-2215-3870-1
0-2216-46130-2612-3080-3
0-2216-6287
main@progress.co.th
www.progress.co.th

Copyright @ 2014 Progress Technology Consultants Co.,Ltd. All right reserved.
Progress Technology Consultants Co.,Ltd.